EDF advances Brazilian offshore wind project with environmental permit
-
6 May 2026
-
Environment, Windfarms
-
Nick Hood
EDF Renewables Brasil has received an environmental authorisation from
Brazil’s environmental regulator IBAMA for biological monitoring and survey
work linked to its proposed Complexo Offshore do Sul I offshore wind project.
The authorisation covers the capture, collection and transport of biological
material as part of the federal environmental licensing process for the
project offshore Rio Grande do Sul in southern Brazil.
The permit supports a range of environmental assessment activities including
marine mammal, bird, fish and benthic monitoring, alongside acoustic surveys
and seabed sampling.
The studies will be carried out by Tetra Tech Engenharia e Consultoria
and include offshore transects, drone surveys and seasonal monitoring campaigns
across multiple locations.
The authorisation is valid until May 2028 and forms part of the wider environmental
impact assessment process for the offshore wind development.